Daejin Environmental Industry Co., Ltd. has the best competitive power in follow-up management, as qualified water pollution environmental engineers for water quality management manage 500 nationwide sites on a regular basis by our own management system and take responsibilities for management for 365 days.
Management seat
Completion management
Completion of installation → Inflow of sewage → Mechanical setting based on water quality of inflow water → Microbial seeding → Analysis of water quality once a week → Resetting of conditions based on the data of water quality → Intensive management according to conditions → Water sampling upon completion → Submission of result reports of a trial run and management guides → Training the operation team and consigned management team.
Ordinary management
Set an inspection cycle for each operation period → Mechanical inspection and water quality analysis by each period → Send contents of management to the operation team and consultation.
A/S management
Receipt of A/S request → Consultation with related departments and analysis of data → Visit the site within 24 hours → Analysis of cause and proper actions → Notification of results of actions.
Professional personnel and Equipment
Technical personnel
4 water pollution environmental engineers, 1 electric engineer, and 1 mechanical engineer.
Vehicles
4 rental vehicles exclusively for water quality management and circulated services.
Operation equipment
Portable DO, MLSS measuring instrument, water quality measurement kit, and pH meter.