Environmental Industry Co.,Ltd.
Water quality management system
  • Summary
    • Daejin Environmental Industry Co., Ltd. has the best competitive power in follow-up management, as qualified water pollution environmental engineers for water quality management manage 500 nationwide sites on a regular basis by our own management system and take responsibilities for management for 365 days.
  • Management seat
    • Completion management
    • Completion of installation → Inflow of sewage → Mechanical setting based on water quality of inflow water → Microbial seeding → Analysis of water quality once a week → Resetting of conditions based on the data of water quality → Intensive management according to conditions → Water sampling upon completion → Submission of result reports of a trial run and management guides → Training the operation team and consigned management team
    • Ordinary management
    • Set an inspection cycle for each operation period → Mechanical inspection and water quality analysis by each period → Send contents of management to the operation team and consultation
    • A/S management
    • Receipt of A/S request → Consultation with related departments and analysis of data → Visit the site within 24 hours → Analysis of cause and proper actions → Notification of results of actions
  • Professional personnel and Equipment
    • Technical personnel
    • 4 water pollution environmental engineers, 1 electric engineer, and 1 mechanical engineer
    • Vehicles
    • 4 rental vehicles exclusively for water quality management and circulated services
    • Operation equipment
    • Portable DO, MLSS measuring instrument, water quality measurement kit, and pH meter
  • Photo
    • A/S Management
    • Water quality management
    • Water collection upon completion