Language ::
ENGLISH
메뉴
열기
About Us
Company overview
Company History
Certificates and Awards
Water quality management system
Directions
Business Introduction
Manufacturing of sewage treatment facility
Design and construction of sewage treatment facility
Construction of water supply and sewage facility
Professional environmental construction
Innovation technology
DS-MBR
FNR
메뉴
닫기
:: FNR ::
DS-MBR
FNR
Principle of FNR technology
Bio-reaction process arrangement composed of anoxic tank, aerobic tank, and ferrous electrolytic device.
Removal of organic matters and nitrogen by biological nitrification / denitrification through anoxic and aerobic processes.
Sewage treatment technology to remove phosphorus by ferrous ions generated from the ferrous electrolytic tank.
Principle of FNR construction method
It is a video of FNR which is the sewage treatment technology.
Principle of nitrogen removal
Principle of phosphorus removal
Features of technology (Advantages and appropriateness of technology)
Flow water is directly used as an organic carbon source required for denitrification (MLE process)
Proactively responding to T-P to strengthen the standards for water quality of effluents
Excellent efficiency of T-P removal regardless of load variations of water quality and changes of temperature
Minimization of scale generation on the cathode surface by applying an electrode switching method
The electrolysis reaction does not affect the growth of nitrifying microorganisms.
Replacement cycle of ferrous electrode : 2 ~ 3 years
Existing contact oxidation tank → Anoxic tank, improvement of aerobic tank process, no additional land
More excellent efficiency of nitrogen removal than the process with anaerobic process
Customer Service
PC Version
Copyright (C) 2017 Dae Jin Environmental Industry co., Ltd. All Rights Reserved.